Skip to main content

Bulk Contracts

Housing Society & Commercial

Bulk waterproofing for CHS societies, malls and commercial buildings. It is the kind of work Runwal Group, Raheja Group and R City bring us in for, and we run it the way a committee needs it run: staged schedules, paperwork you can circulate, and an AMC afterwards if that suits you.

Housing Society & Commercial carried out in Thane & Mumbai — Mahadev Waterproofing

The method

How we actually do it

Waterproofing almost always fails at the small details rather than the big ones, so we follow the same sequence on every job. Here it is, and you’re welcome to hold us to it.

  1. A full building survey and a written condition report

  2. An itemised quotation the committee can circulate

  3. Phased execution so residents are not disturbed

  4. An annual maintenance contract offered after handover

Named on your quotation

  • Dr. Fixit
  • BASF
  • Pidilite
  • Asian Paints
  • STP
  • Nerolac
  • Sika
  • Fosroc

Next step

Get a quote for housing society & commercial

You get a free site inspection, a written diagnosis and an itemised price, usually within a day of ringing us.

Warranty
10 years, in writing
Site visit
Free, usually same day
Areas covered
Thane, Mulund, Ghatkopar, Andheri & Mumbai
Experience
Since 2008, 500+ projects

Ask about housing society & commercial

We’ll call you back within a couple of hours, as long as it’s during working hours.

Your details go straight to our team on WhatsApp, and we won’t share them with anyone or send you anything you didn’t ask for. If you’d rather just talk, call +91 99875 06070.

Questions

Housing Society & Commercial: the questions we get asked

These are the ones that come up on the phone most weeks. If yours isn’t here, ring us and ask it — we’d rather answer it before you book than after.

What paperwork does the committee get?

A written building condition report after the survey, an itemised quotation broken down by area and stage that can be circulated to members, and the signed 10-year warranty on completion. All of it in a form you can attach to a meeting agenda.

How is a society contract billed?

In stages against completed work, agreed in the quotation before anything starts. Nothing is added later unless the committee approves it in writing.

Will residents be disturbed?

We phase execution wing by wing and work within the hours the committee sets. Material is stored in one designated place and the site is cleared at the end of each day.

Do you offer an AMC afterwards?

Yes — an annual maintenance contract with a pre-monsoon inspection and minor repairs included. It is offered after handover; it is not bundled into the original price.

Who we do this for

Clients this work is carried out for

Photographed by us on their sites. Scope and figures for any individual contract stay between us and them.

Where we carry out Housing Society & Commercial

Housing Society & Commercial — most asked for in

We also work across Powai, Borivali, Bhandup, Kalyan, Dombivli and Navi Mumbai. Ask whether we cover your building →

Same-day response

Leaking right now? Call us before it spreads.

Leave a leak through one monsoon and it’ll cost you several times more to put right than it would this week. The inspection is free either way.