Skip to main content

Ramee Hotel

Juhu

A hotel on the Juhu seafront, where salt-laden air is as much of a problem for the building fabric as the rain is.

Waterproofing project at Ramee Hotel, Juhu — Mahadev Waterproofing

Photographed on site by our own crew. Ramee Hotel, Juhu.

The same either way

A mall podium and one bathroom get the same method

Commercial clients get phasing, paperwork and staged billing on top. What doesn’t change is the diagnosis, the named materials or the warranty.

Diagnosis
Thermal imaging and moisture readings before a price is quoted.
Materials
Dr. Fixit, BASF, Pidilite, STP and Asian Paints, named on the quotation.
Crew
Our own trained team from day one to handover, not subcontracted labour.
Warranty
A signed 10-year document, handed over before work begins.

Free inspection

Get the same standard at your building

Book a free site inspection and we’ll scan the affected area, explain what’s causing it and put an itemised quote in writing. If you decide not to go ahead, that’s completely fine.

Same-day response

Leaking right now? Call us before it spreads.

Leave a leak through one monsoon and it’ll cost you several times more to put right than it would this week. The inspection is free either way.